Transformer transport, installation & energization

Installation of transmission transformers up to 220kV under a rigorous technical procedure: safe, accurate and efficient.

Services

Turnkey, from factory to substation

With experienced engineers and specialised equipment, MEEPOWER covers every stage: transport, positioning, installation, connection, testing and adjustment, through to acceptance and commissioning.

All work complies with power-industry standards and EVN regulations, delivering 220kV transmission systems that run stably, reliably and sustainably.

Ready to roll

Our process

  1. 01

    Transport

    Heavy-haul transport planning, route survey, reinforcement and supervision throughout the journey.

  2. 02

    Positioning

    Unloading, jacking and precise positioning on the foundation according to the substation design.

  3. 03

    Installation

    Mounting bushings, radiators, conservator, tap changer and accessories; vacuum treatment and oil filling.

  4. 04

    Connection

    Primary and secondary connections, control and protection circuits, and the cooling system.

  5. 05

    Testing & adjustment

    Site tests, oil analysis and adjustment of equipment to standard.

  6. 06

    Acceptance & energization

    Acceptance with the operator, energization and post-energization monitoring.

Featured project

220kV-250MVA transformer – Binh Tan 220kV substation

Two 220kV-250MVA transformers designed and manufactured by MEEPOWER were transported from the factory, installed and successfully energized at Binh Tan 220kV substation in 2025, and accepted by Ho Chi Minh City Power Corporation in October and November 2025.

Read the project story